Works to replace the existing beach access ramp will kick off in May, with completion expected by the end of June.The existing ramp is damaged and slippery with the new one designed to be stronger and safer thanks to handrails, fall protection and non-slip decking.The new ramp will match the existing in its style, size and alignment, but includes structural upgrades so it is stronger and able
Marengo Beach, 2 Marengo Cr, Marengo 3233 View Map